This site is using a trial version of cloudscribe Newsletter Solution, please purchase a license to remove this message
This site is using a trial version of cloudscribe Forms and Surveys Solution, please purchase a license to remove this message
Skip to main content
HAUC
HAUC

Installation of ducts/cables

S6.6.10
The duct/cable must be installed in the base of the slot and held in place using clips, plugs of high density foam, or other suitable means.
S6.6.11
The finished level of the duct/cable must not vary from the agreed depth by more than 20 mm.
S6.6.12
The duct/cable must incorporate a tracer (often an integral metal wire) to facilitate detection in future.