            Requirements for natural material modules
            
        
        
        
    
	- A12.2.5
- 
	General for whole natural material modulesThe reinstatement of whole natural material modules must be in accordance with the general requirements of A12.2.1 to A12.2.4.
- A12.2.6
- 
	Damaged natural material modules
		- Where damaged modules are to be re-used in the reinstatement, a joint inspection must be arranged before starting excavation to agree the extent of usage of damage modules and the minimum size acceptable for re-use.
- The undertaker should make a photographic record of the joint inspection which should be agreed between the undertaker and the authority.
- The undertaker must use best endeavours to match existing profiles and meet the tolerances specified in S2, However, where the pre-existing profile of damaged modules is near or in excess of current intervention and construction tolerances specified in S2, it will be difficult for the undertaker to construct a complying reinstatement. The undertaker must use best endeavours to ensure that the interface between the reinstatement and the adjoining surfaces does not create a hazardous trips.